My Experience with Stratasys Direct Mfg.
06/2017 - 10/2017
- Improvised Continuous Improvements with emphasis on Lean Manufacturing by improving individuals, processes and products.
- Solved problems that may hinder the production by collaborating with fellow workmates, doing experiments, and collecting data to prove that a feasible method chosen is an optimal solution.
- Designed Jigs to improve measurements and experiments.
- Conducted tensile testing to determine the stress failure for different materials.
- Assisted with documentations by updating and developing work procedures.
- Executed meetings and proposed solutions to upper managements and engineers by presenting 3 Phases: Concept Design Phase, Design Review Phase, and Production Phase.