My Experience with Stratasys Direct Mfg.

06/2017 - 10/2017

  • Improvised Continuous Improvements with emphasis on Lean Manufacturing by improving individuals, processes and products.
  • Solved problems that may hinder the production by collaborating with fellow workmates, doing experiments, and collecting data to prove that a feasible method chosen is an optimal solution.
  • Designed Jigs to improve measurements and experiments.
  • Conducted tensile testing to determine the stress failure for different materials.
  • Assisted with documentations by updating and developing work procedures.
  • Executed meetings and proposed solutions to upper managements and engineers by presenting 3 Phases: Concept Design Phase, Design Review Phase, and Production Phase.